Project: RANS21RB   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Randall Brooks   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:1990
Total Flight Time:
Start/Last Date:Apr 03, 2021 - No Finish Date
Engine:Titan IO-340 180HP
Propeller:Whirlwind
 
Friendly URL: https://eaabuilderslog.org?s=RANS21RB

Home or Last Project Picture

Nov 09, 2021     Longeron supports install - (3.5 hours)       Category: Fuselage
Drilled and installed mid longeron support on both L and R sides. Drilled and installed lower longeron support on right side. I chose to sandwich the cage gusset between the longeron and the support as the bottom skin holes and side skin spacing lined up perfectly that way.


 